The game was played at Sporting KC 15 days after install of Northbridge Bermuda . A new layer of DAKOTA Mix was put in after stripping the field and then topdressed with the mix after turf install as well. A REV Turf Pro treatment was applied. Four inches of roots and seams knitted in less than 14 days. Playing firm, fast, and true,